ask marcus when he is running OPAL tests.
And I need that when I integrate because there are ALWAYS broken tests and 
right now I have to remember the list 
or open two images.

Lukas not everybody has the chances to work on system with not broken tests.

Stef

>> icons to see which tests failed since last run and a summary
>> 
>> previous run:                   current:
>>        150 green                               149 green
>>        2 failure                               2 failutres
>>                                                1 errors
>> 
>> could be presented differently
> 
> I doubt that this is useful within an image. I run different sub-sets
> of my tests far too often to see something meaningful between the
> current and previous run.
> 
> Hudson shows the deltas of errors/failures/passes and added/removed
> tests between builds in various graphs and tables.

sure but do I want to want 20 minutes for a run to be scheduled on a server I 
do not control?

> 
> Lukas
> 
> -- 
> Lukas Renggli
> www.lukas-renggli.ch
> 
> _______________________________________________
> Pharo-project mailing list
> [email protected]
> http://lists.gforge.inria.fr/cgi-bin/mailman/listinfo/pharo-project


_______________________________________________
Pharo-project mailing list
[email protected]
http://lists.gforge.inria.fr/cgi-bin/mailman/listinfo/pharo-project

Reply via email to