ask marcus when he is running OPAL tests. And I need that when I integrate because there are ALWAYS broken tests and right now I have to remember the list or open two images.
Lukas not everybody has the chances to work on system with not broken tests. Stef >> icons to see which tests failed since last run and a summary >> >> previous run: current: >> 150 green 149 green >> 2 failure 2 failutres >> 1 errors >> >> could be presented differently > > I doubt that this is useful within an image. I run different sub-sets > of my tests far too often to see something meaningful between the > current and previous run. > > Hudson shows the deltas of errors/failures/passes and added/removed > tests between builds in various graphs and tables. sure but do I want to want 20 minutes for a run to be scheduled on a server I do not control? > > Lukas > > -- > Lukas Renggli > www.lukas-renggli.ch > > _______________________________________________ > Pharo-project mailing list > [email protected] > http://lists.gforge.inria.fr/cgi-bin/mailman/listinfo/pharo-project _______________________________________________ Pharo-project mailing list [email protected] http://lists.gforge.inria.fr/cgi-bin/mailman/listinfo/pharo-project
