Imagine IBM paying engineers to maintain an smalltalk application during
like 10 years, and I still find some really ugly bugs hehe

On 23 August 2011 14:12, Stéphane Ducasse <[email protected]> wrote:

> Don't feel guilty :)
> But send fixes so that we can collect them for a given version.
>
> And we will not get perfect systems. Imagine IBM payed during several year
> 100 engineers to build eclipse
> and so far we got one engineer 8 months.
>
> Stef
>
>
> On Aug 23, 2011, at 9:57 AM, Lukas Renggli wrote:
>
> >>> Now I think the subliminal message of this thread is that the Pharo
> >>> community should focus on making the existing images really stable
> >>> before hacking away on Pharo 1.4 and beyond ... :-)
> >>
> >> And we need more people actually looking at the bug tracker... I
> sometimes
> >> feel a bit lonely...
> >
> > Yes, I feel guilty of not being able to contribute more fixes. You are
> > doing the excellent job of integrating submitted patches
> > instantaneous.
> >
> > The problem is that the unstable versions are pushed extremely hard,
> > while the supposedly stable versions are still unstable. I don't see
> > how this can possibly work?
> >
> > Subsequently, I hesitate to submit a patch for an old version because
> > I know it won't be possible to merge it into newer versions. This is a
> > vicious circle.
> >
> > Lukas
> >
> > --
> > Lukas Renggli
> > www.lukas-renggli.ch
> >
>
>
>

Reply via email to