So what do we do?
because frankly I'm fed up and when I see 

10
then 
102

for a baseline when we had dependency to a project that else makes sure that 
the system does not work at all
I'm puzzled.

Now I do not have the time to change that. if you have go ahead.

A bit of rigor and consistency would help.
I do not understand why programmer number things like that 
at leas we should have 
        1.1
        1.2
                
        2.0 means major changes

        to me 1.0.2 does not mean nothing.

Stef

Reply via email to