So what do we do? because frankly I'm fed up and when I see 10 then 102
for a baseline when we had dependency to a project that else makes sure that
the system does not work at all
I'm puzzled.
Now I do not have the time to change that. if you have go ahead.
A bit of rigor and consistency would help.
I do not understand why programmer number things like that
at leas we should have
1.1
1.2
2.0 means major changes
to me 1.0.2 does not mean nothing.
Stef