On Friday 01 May 2009 18:40:00 Rob Scheepmaker wrote:
> These are the main issues I encountered. Please try the systray from trunk
> some time and give your feedback on these issues or provide your own
> points.

I've been seeing a logic issue for some time, I'll use this poke to finally 
tell you :-)

When having multiple jobs running at the same time (say I'm copying two DVD 
images), the jobs popup shows the cumulated time of those. So if one job takes 
another 20 minutes, and the other one 15 minutes it'll show that these jobs 
will take 35 minutes, it should of course be 20 minutes (the maximum of those 
times).
-- 
sebas

 http://www.kde.org | http://vizZzion.org |  GPG Key ID: 9119 0EF9 

Attachment: signature.asc
Description: This is a digitally signed message part.

_______________________________________________
Plasma-devel mailing list
Plasma-devel@kde.org
https://mail.kde.org/mailman/listinfo/plasma-devel

Reply via email to