Hi,

I just moved into a house in South Chandler and when Cox configured my Internet 
and phone, they had to setup a temp connection.  This consists of a coax 
running through my back yard down the side of my house and into the junction 
box.  Funny thing is the box that services the 5 housed in my cluster is all of 
2 feet from the junction box into my house.

I'm not making this up.  When Cox engineered this sub-division they made a 
mistake and put in a 4 node connection.  The tech that came out to followup 
told me they could not add me to that box.

They have to connect me to the box that serves another set of houses.  This 
requires running a conduit about 18 inches underground along the sidewalk (from 
behind my house) and under my driveway to the junction box on the other side of 
my house.  I was told it would take around 6 weeks to get the permit to do so.  
It is unclear how much longer it will take after that.  I was told they are 
putting a rush on this project.

I work out of my house and would like to find an additional solution. I like 
Cox.  I've had cox service for maybe 6 years now.  I had been with Qwest and 
had DSL for a while.  Liked them also.

I'm thinking that maybe I'll try qwest or look at that as a backup plan.

I'm wondering about what DSL routers are being used and the quality.  When I 
had DLS last I had a Cisco rounter that would overheat. I had little problem 
with mine. The Cisco was nice in that it was programmable.  Then I had an 
ActionTec (sp) , however that would not allow for port forwarding even though 
it was a feature.

Looks like DSL speed is way up.  Any input or suggestions on Qwest DSL?

Thanks in advance!
Keith 


------------------------
Keith Smith


      
---------------------------------------------------
PLUG-discuss mailing list - [email protected]
To subscribe, unsubscribe, or to change your mail settings:
http://lists.PLUG.phoenix.az.us/mailman/listinfo/plug-discuss

Reply via email to