DO NOT REPLY TO THIS EMAIL, BUT PLEASE POST YOUR BUG 
RELATED COMMENTS THROUGH THE WEB INTERFACE AVAILABLE AT
<http://nagoya.apache.org/bugzilla/show_bug.cgi?id=27497>.
ANY REPLY MADE TO THIS MESSAGE WILL NOT BE COLLECTED AND 
INSERTED IN THE BUG DATABASE.

http://nagoya.apache.org/bugzilla/show_bug.cgi?id=27497

Charts not working

           Summary: Charts not working
           Product: POI
           Version: 2.0FINAL
          Platform: All
        OS/Version: Other
            Status: NEW
          Severity: Major
          Priority: Other
         Component: POI Overall
        AssignedTo: [EMAIL PROTECTED]
        ReportedBy: [EMAIL PROTECTED]


I have recently updated to the POI 2.5-final realease of POI from the 2.0 
Final, and when I dynamically populate data which feeds into charts, the Excel 
File becomes corrupt.

I switched back to 2.0-final and everything worked fine.

Basically to repeat this bug:

1) create an Excel Worksheet with a chart (by selecting the data) in Excel
2) through POI, open the worksheet and change the data which feeds the chart
3) open the modified Excel Document in Excel, and the (File Corrupt) error 
message occurs

... wish I had more details about this... seems to be something with the 2.5 
final release, (Maybe dealing with the Escher format code or something) 
everything works great when I use the 2.0 jars.

---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]

Reply via email to