Hi, I have millions of points in a PostGIS database containing taxi gps tracks. Now I want to create lines from these points by vehicleid and ordered by timestamp. But, and that's my problem right now, at first I want to include every column of my point table into the "line table" and I also need to intersect those lines at specific points.
I have one column representing the "taxi_is_occupied" status with 0 or 1. What I want now is to create lines which are divided every time this status changes. In the end I need lines which show the path of every taxi over time, divided every time the status of the car changes so that I can query all lines where the taxi is occupied, for example. What do I have to use therefore? I know that there is the ST_MakeLines tool existing in PostGIS, but as I am a new PostGIS user... I do not know exactly how to use it to get the results I need. Thanks a lot
_______________________________________________ postgis-users mailing list [email protected] http://lists.osgeo.org/cgi-bin/mailman/listinfo/postgis-users
