Fort Calhoun is in the process of changing from the Thermo EPD-MK2 to the 
DMC-2000.  We just changed to the Landauer OSLN for record dose.  I mention the 
OSLN as I consider it an important part of managing the record dosimeter to 
electronic dosimeter mismatch.  With the OSLN, we can do a local 
(non-accredited read) as needed/desired to verify and tweak the EAD bias.

Our goal here is to have the average cumulative bias about 5% EAD over record 
dosimeter.  We are going to be a bit more conservative than that until we get 
more in-plant data to enable us to refine it.  We know that there is going to 
be the occasional outlier when a worker enters an area with a very different 
gamma energy - for example inside the biological shield at power.  Bottom 
line...we just have to keep on top of the issue.


David Brehm
Fort Calhoun Nuclear Station
Supervisor - Radiological Equipment & Dosimetry
Office: 402.533.7582
Cellular: 402.214.0107
Pager: 402.561.3310

From: [email protected] [mailto:[email protected]] On Behalf Of 
Armstrong, Joel L
Sent: Thursday, January 13, 2011 6:54 PM
To: [email protected]
Subject: RE: Powernet: RE: Electronic Dosimeter Bias

Just returned from the EPRI symposium in warm Ft Lauderdale.  One of the papers 
discussed the need to evaluate the ED bias due to our source term reduction 
efforts particularly chemistry changes/controls.  The programs we're pushing to 
reduce the source term may well be changing the component isotopes in the crud 
layers and as such changing the average gamma energy.  TVA like most utilities 
still calibrates EDs with Cs-137 but the average energy assumptions may no 
longer be true which may cause the EDs to under respond.  None of us want to 
get our TLD reads and find our outage dose is higher than what we though.

Joel Armstrong

From: [email protected] [mailto:[email protected]] On Behalf Of 
[email protected]
Sent: Tuesday, January 11, 2011 4:11 PM
To: [email protected]
Subject: Powernet: RE: Electronic Dosimeter Bias

Palo Verde provides the following response:

Palo Verde uses the DMC-2000S electronic dosimeters and they are biased by 1.07 
(+7%).  Our ED to TLD comparison by total dose is routinely +/- 2%.  Management 
is fully aware of how close the dose is by both systems and that the only dose 
we get back during outages is in multi-pack incremental recording.  Over the 
years, we have performed numerous TLD/ED studies of all of the individual 
results and have very stringent criteria for their comparisons.  With these 
reviews, we have refined the ED bias to where it is today.  As of yet, we have 
not seen any changes in ED to TLD data based on Steam Generator and Rx Head 
replacements, or from the power up-rate.

One of our "advantages" is that, with an outage every six months, and six-month 
monitoring cycles, we never have a low total dose personnel cycle.  Each read 
cycle contains outage man-rem exposure totals.  So with our TLD LLD of only 5 
mrem, and minimal doses incurred by personnel in the PA when EDs are not worn 
but TLDs are, the TLDs and EDs do match very well.  And we are very pleased 
with the accuracy, rather than any extra conservatisms.

Seth.

**********************************************************************
Seth J. Kanter, CHP, RPT
Sr. Health Physicist
Palo Verde Nuclear Generating Station
Mail Sta. 7397
5801 S. Wintersburg Rd.
Tonopah, AZ 85354
Phone (623) 393-3130
Fax (623) 393-2487
Unless otherwise noted, all opinions are my own
Liviu Librescu
**********************************************************************


From: [email protected] [mailto:[email protected]] On Behalf Of 
Courtenay, Christopher C
Sent: Tuesday, December 14, 2010 12:37 PM
To: [email protected]
Subject: Powernet: Electronic Dosimeter Bias

Duke Energy would like to know the following:


1.       Do you bias your EDs to over-respond in the field?

2.       What bias do you apply if you do? (5%, 10%, etc)

3.       Have you noticed a change in ED response due to changing plant 
conditions (Co58/Co60 ratio changes due to Zinc injection, etc) or specific 
jobs (weld overlay, alloy 600, etc)?

Point of reference - Duke uses the DMC2000S from Mirion.

Chris Courtenay
Engineer, Duke Energy
980-875-5005
"To the optimist, the glass is half full.  To the pessimist, the glass is half 
empty.  To the engineer, the glass is twice as big as it needs to be."

--- NOTICE ---

This message is for the designated recipient only and may contain confidential, 
privileged or proprietary information.  If you have received it in error, 
please notify the sender immediately and delete the original and any copy or 
printout.  Unintended recipients are prohibited from making any other use of 
this e-mail.  Although we have taken reasonable precautions to ensure no 
viruses are present in this e-mail, we accept no liability for any loss or 
damage arising from the use of this e-mail or attachments, or for any delay or 
errors or omissions in the contents which result from e-mail transmission.

This e-mail contains Omaha Public Power District's confidential and proprietary 
information and is for use only by the intended recipient.  Unless explicitly 
stated otherwise, this e-mail is not a contract offer, amendment, nor 
acceptance.  If you are not the intended recipient you are notified that 
disclosing, copying, distributing or taking any action in reliance on the 
contents of this information is strictly prohibited.

Reply via email to