North Anna's response is listed below. Barbara Thompson Supervisor of Exposure Control Dominion - North Anna Power Station Email: [email protected]<mailto:[email protected]> Phone: 540-894-2605 Beeper: #3469
From: [email protected] [mailto:[email protected]] On Behalf Of Barber, Jerry Sent: Monday, June 13, 2011 6:14 PM To: '[email protected]' Subject: Powernet: RP "Non-Core" Responsibilities I have been asked to compare RP's "non-core" responsibility commitments at our site to other sites. To assist in this effort, I would appreciate answers to the following questions: Does RP calibrate radiation monitors? Yes If so, which type? Area Monitors? Remote monitoring Area Monitors Process Monitors? No. Accident Monitors? No. Does RP sample storm drains (per ANI, for tritium and gamma analysis)? Yes. If so, at what frequency are these samples collected? Monthly and quarterly. Does RP obtain soil samples from locations inside the site boundary for gamma analysis? No. If so, at what frequency are these samples collected? N/A Does RP perform sampling of volumetric materials (oil, soil, concrete, etc.) for unconditional release? Yes. Is RP responsible for calibrating/maintaining/daily operability checks for the following? Gamma Spectroscopy Equipment Yes. Alpha and beta proportional counters Yes. Is RP responsible for the Confined Space Program? No. Does RP perform all atmospheric sampling for confined spaces? Yes. Is RP responsible for sluicing secondary resin? No. Is RP responsible for sluicing primary resin? No, just HP job coverage. Is RP responsible for dewatering resin for shipment? No, just HP job coverage. Is RP responsible for packaging radioactive waste casks for shipment? Yes. Do RP technicians manage all day to day dosimetry operations (issue TLDs, perform Personnel Exposure Investigations for anomalous ED or TLD readings, badge exchange, etc.)? Yes. And finally, How many units do you have (2 PWR units) , and how many RP technicians do you have per unit? Total of 35 HP Technicians/Equivalents - we do not have separate HP staff per unit. Please include all RP technician/equivalents who perform ALARA planning, RWPs, Outage Planning, Dosimetry, Instruments, Respiratory Protection, Radioactive Waste, Confined Space sampling/permitting no matter what organization they report to. Thanks for helping make Powernet work for all of us!!!!! Jerry Barber Lead RC Specialist H.B. Robinson Nuclear Plant 843-857-1496 [email protected] CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.
