DCPP is conducting benchmarking regarding RCA Egress processes:

1. Does your plant have any unmonitored (no RP presence) RCA egress points that 
are always opened?

2. Is your plant's normal RCA egress point staffed continuously by RP personnel 
24/7?

3. What items, if any, does your Program allow a person to wear through the 
personnel contamination monitor and therefore be monitored for release, via the 
PCM? Examples include security key cards, TLDs, hard hat lights, items attached 
to lanyards (pens), items attached to belts (pagers, phones, knives).

4. What items, if any, does your Program allow a worker to self-survey from the 
RCA through a small article monitor (SAM) only (no frisk - no smear)?  Examples 
include clip boards, pens, pocket contents.

5. Does your Program require personal items monitored with a SAM to be put back 
on and then worn through the PCM as well?

6. If your Program allows workers to self-survey personal items, is the person 
permitted to repeat the survey on a single alarm or is there immediate RP 
intervention?

7. If an item alarms the SAM does your Program require multiple negative counts 
at a changed geometry before release?

8. If several items alarm the SAM in the aggregate, how does your Program allow 
for the release the non-contaminated items once the contaminated item is 
determined? Must the items pass the SAM as an aggregate? What if no 
contaminated item can be determined?

9. What management level of authorization, if any, is required to release an 
item from the RCA?



James Ramirez
Diablo Canyon Nuclear Power Plant
Operations Specialist Supervisor
Email: [email protected]
104/5/26B, 9 miles NW Avila Beach
Avila Beach, CA   93424
(805) 545-4946 (desk)
(805) 441-5444 (cell)
* Please consider the environment before printing this e-mail.



Reply via email to