Palo Verde provides the following response:
Steam Generator Replacement Outages
Unit 2 190 PCEs (2.40 PCEs/day) (fall 2003)
Unit 1 126 PCEs (1.64 PCEs/day) (fall 2005)
Unit 3 154 PCEs (1.37 PCEs/day) (fall 2007)

Reactor Vessel Head Replacements
Unit 2 28 PCEs (0.46 PCEs/day) (fall 2009)
Unit 1 43 PCEs (0.86 PCEs/day) (spring 2010)
Unit 3 20 PCEs (0.50 PCEs/day) (fall 2010)


[cid:[email protected]]
Kenneth Walter
RP Technical Advisor, Radiological Engineering
P.O. Box 52034, Tonopah, AZ 85354, M.S. 7663
Tel 623 393 5482 Fax 623 393 6640
[email protected]<mailto:[email protected]>

From: [email protected] [mailto:[email protected]] On Behalf Of 
Gumnick, John
Sent: Tuesday, January 10, 2012 6:59 AM
To: [email protected]
Cc: Warren, Douglas
Subject: Powernet: SGRP/RVH OPEX

Waterford 3 would like to benchmark total PCEs on steam generator and reactor 
vessel head replacement project outages, with special interest in the 
experience of anyone who has done both in the same outage.

Please reply to me or the group and I will tabulate and report back any data I 
receive to the group.

Thanks,

JG

John Gumnick
Radiation Protection Manager
Waterford 3
Office: 504-464-3490
Cell: 504-201-5138
--- NOTICE ---

This message is for the designated recipient only and may contain confidential, 
privileged or proprietary information.  If you have received it in error, 
please notify the sender immediately and delete the original and any copy or 
printout.  Unintended recipients are prohibited from making any other use of 
this e-mail.  Although we have taken reasonable precautions to ensure no 
viruses are present in this e-mail, we accept no liability for any loss or 
damage arising from the use of this e-mail or attachments, or for any delay or 
errors or omissions in the contents which result from e-mail transmission.

<<inline: image001.png>>

Reply via email to