Palo Verde provides the following response: Steam Generator Replacement Outages Unit 2 190 PCEs (2.40 PCEs/day) (fall 2003) Unit 1 126 PCEs (1.64 PCEs/day) (fall 2005) Unit 3 154 PCEs (1.37 PCEs/day) (fall 2007)
Reactor Vessel Head Replacements Unit 2 28 PCEs (0.46 PCEs/day) (fall 2009) Unit 1 43 PCEs (0.86 PCEs/day) (spring 2010) Unit 3 20 PCEs (0.50 PCEs/day) (fall 2010) [cid:[email protected]] Kenneth Walter RP Technical Advisor, Radiological Engineering P.O. Box 52034, Tonopah, AZ 85354, M.S. 7663 Tel 623 393 5482 Fax 623 393 6640 [email protected]<mailto:[email protected]> From: [email protected] [mailto:[email protected]] On Behalf Of Gumnick, John Sent: Tuesday, January 10, 2012 6:59 AM To: [email protected] Cc: Warren, Douglas Subject: Powernet: SGRP/RVH OPEX Waterford 3 would like to benchmark total PCEs on steam generator and reactor vessel head replacement project outages, with special interest in the experience of anyone who has done both in the same outage. Please reply to me or the group and I will tabulate and report back any data I receive to the group. Thanks, JG John Gumnick Radiation Protection Manager Waterford 3 Office: 504-464-3490 Cell: 504-201-5138 --- NOTICE --- This message is for the designated recipient only and may contain confidential, privileged or proprietary information. If you have received it in error, please notify the sender immediately and delete the original and any copy or printout. Unintended recipients are prohibited from making any other use of this e-mail. Although we have taken reasonable precautions to ensure no viruses are present in this e-mail, we accept no liability for any loss or damage arising from the use of this e-mail or attachments, or for any delay or errors or omissions in the contents which result from e-mail transmission.
<<inline: image001.png>>