Palo Verde does not require instruments to be source checked after down posting
From: owner-power...@hps1.org [mailto:owner-power...@hps1.org] On Behalf Of John Sukosky Sent: Monday, April 09, 2012 8:10 AM To: powernet@hps1.org Cc: Duane Boone Subject: Powernet: Quick Posting Question Surry Power Station would like to know if you require survey instruments used to down post High Radiation Areas to be source checked after the down posting survey is completed? At Surry, survey instruments used to down post HRA are source checked after the down posting survey is completed. Thanks, John M. Sukosky, CHP Health Physicist III Radiological Protection, Surry Power Station Dominion Generation Phone: 757-365-2594; Internal: 8-798-2594 Fax: 757-365-2668 Pager: 804-273-3030 3636; E-mail: john.suko...@dom.com<mailto:john.suko...@dom.com> From: owner-power...@hps1.org [mailto:owner-power...@hps1.org] On Behalf Of seth.kan...@aps.com Sent: Wednesday, March 21, 2012 7:52 PM To: powernet@hps1.org Subject: RE: Powernet: Quick Question (Outage Dose Goal Revision?) Under these conditions Palo Verde would convene an ALARA Committee meeting and revise the outage dose goal upward; conversely, if conditions were much lower than anticipated we would use the same process to lower the goal. Fortunately, we have done the latter numerous times. The upward revision based on emergent work / scope change is also approved by the ALARA Committee as a stretch goal (amount estimated above the original estimate). While the final reported RFO dose would include all work, the ALARA incentives offered to employees are based on the original dose estimation; thereby. not penalizing (and disincentivizing) them because of conditions beyond their control. From: owner-power...@hps1.org [mailto:owner-power...@hps1.org] On Behalf Of stevie.vaug...@sce.com Sent: Thursday, February 23, 2012 1:05 AM To: powernet@hps1.org Subject: Powernet: Quick Question (Outage Dose Goal Revision?) At SONGS, the outage dose goal is set prior to the outage like all sites. At the onset of the outage, we had higher than expected dose rates (crud burst with new generators) and revised our outage dose goal accordingly. Would your site have revised the outage goal is similar event occurred? In addition, during the outage it has been determined that additional emergent work will be required to support increased inspections on our steam generators which is dose impacting. Would your site revise your outage dose goal a second time based upon the increased emergent work expected? Or would your site maintain your revised dose goal as is and track the emergent dose as separate goal? Thanks, "Stevie Ray" Vaughan stevie.vaug...@sce.com ----------------------------------- Powernet - a service of the Health Physics Society Power Reactor Section Powernet archives at http://www.mail-archive.com/powernet@hps1.org/ Reply to: powernet@hps1.org If Questions, contact Mike Russell, CHP at russe...@songs.sce.com --- NOTICE --- This message is for the designated recipient only and may contain confidential, privileged or proprietary information. If you have received it in error, please notify the sender immediately and delete the original and any copy or printout. Unintended recipients are prohibited from making any other use of this e-mail. Although we have taken reasonable precautions to ensure no viruses are present in this e-mail, we accept no liability for any loss or damage arising from the use of this e-mail or attachments, or for any delay or errors or omissions in the contents which result from e-mail transmission. CONFIDENTIALITY NOTICE: This electronic message contains information which may be legally confidential and/or privileged and does not in any case represent a firm ENERGY COMMODITY bid or offer relating thereto which binds the sender without an additional express written confirmation to that effect. The information is intended solely for the individual or entity named above and access by anyone else is unauthorized. If you are not the intended recipient, any disclosure, copying, distribution, or use of the contents of this information is prohibited and may be unlawful. If you have received this electronic transmission in error, please reply immediately to the sender that you have received the message in error, and delete it. Thank you.