Duke Energy would like to know if stations require verification of torque on 
shipping package bolts  by methods such as:


(1)    Bench verification of calibration of torque wrench used prior to 
departure of cask from shipping site

(2)    Use of second wrench to check torque

Thank you,
Graham Johnson

Reply via email to