Exelon utilizes a SAM for unconditional release of material from the RCA.  
Items too large to be released via the SAM are unconditionally released via 
handheld instruments and requires a second verification survey performed by 
another qualified (ANSI) RPT.

Kevin W. Hedgspeth
Corporate Manager Radiation Protection Operations
[cid:[email protected]]
Phone: (630)657-2194
Cell: (815)866-2224
[email protected]

From: [email protected] [mailto:[email protected]] On Behalf Of 
Creamer, Charles E
Sent: Tuesday, July 08, 2014 12:08 PM
To: '[email protected]'
Subject: Powernet: Unconditionally Releasing Material from the RCA

Browns Ferry currently requires an independent survey by a senior RP technician 
for those items being unconditionally released from the RCA.

Does your station have this requirement?

Chuck Creamer
Charles E. Creamer
Health Physicist
Tennessee Valley Authority
Browns Ferry Nuclear Plant
P.O. Box 2000 (Mail Stop NAB-1G-BFN)
Decatur, Al. 35609-2000
Phone: 256-729-2983
Fax:  256-729-3101
Pager: 1-800-323-4853, pin 30-053
mailto:[email protected]

REMEMBER - You don't know what you don't know

This electronic message transmission contains information which may be TVA 
SENSITIVE, TVA RESTRICTED or TVA CONFIDENTIAL. Any misuse or unauthorized 
disclosure can result in both civil and criminal penalties. If you are not the 
intended recipient, be aware that any disclosure, copying, distribution or use 
of the content of this information is prohibited. If you have received this 
communication in error, please notify me immediately by email and delete the 
original message.


This e-mail and any attachments are confidential, may contain legal,
professional or other privileged information, and are intended solely for the
addressee. If you are not the intended recipient, do not use the information
in this e-mail in any way, delete this e-mail and notify the sender. -EXCIP

Reply via email to