Browns Ferry currently has a process where the ED set points are set lower than 
the RWP limit.  The ED set points are based on the work area where the worker 
is working and can be much lower than the RWP limit. The set points can be 
different for each work order on the RWP depending on where it is being worked. 
 This is done to drive down the set points to more closely reflect what the 
workers are picking up and not have thousands of RWPs.  The option is also 
available to have individual set points for the worker if it is necessary to be 
above the default set points for the work order as long as it is below the RWP 
limit.

Does your station have such a process?  Could I get a copy of your procedural 
guidance?


Chuck Creamer
Charles E. Creamer
Health Physicist
Tennessee Valley Authority
Browns Ferry Nuclear Plant
P.O. Box 2000 (Mail Stop NAB-1G-BFN)
Decatur, Al. 35609-2000
Phone: 256-729-2983
Fax:  256-729-3101
Pager: 1-800-323-4853, pin 30-053
mailto:[email protected]

REMEMBER - You don't know what you don't know

This electronic message transmission contains information which may be TVA 
SENSITIVE, TVA RESTRICTED or TVA CONFIDENTIAL. Any misuse or unauthorized 
disclosure can result in both civil and criminal penalties. If you are not the 
intended recipient, be aware that any disclosure, copying, distribution or use 
of the content of this information is prohibited. If you have received this 
communication in error, please notify me immediately by email and delete the 
original message.


Reply via email to