Browns Ferry currently has a process where the ED set points are set lower than the RWP limit. The ED set points are based on the work area where the worker is working and can be much lower than the RWP limit. The set points can be different for each work order on the RWP depending on where it is being worked. This is done to drive down the set points to more closely reflect what the workers are picking up and not have thousands of RWPs. The option is also available to have individual set points for the worker if it is necessary to be above the default set points for the work order as long as it is below the RWP limit.
Does your station have such a process? Could I get a copy of your procedural guidance? Chuck Creamer Charles E. Creamer Health Physicist Tennessee Valley Authority Browns Ferry Nuclear Plant P.O. Box 2000 (Mail Stop NAB-1G-BFN) Decatur, Al. 35609-2000 Phone: 256-729-2983 Fax: 256-729-3101 Pager: 1-800-323-4853, pin 30-053 mailto:[email protected] REMEMBER - You don't know what you don't know This electronic message transmission contains information which may be TVA SENSITIVE, TVA RESTRICTED or TVA CONFIDENTIAL. Any misuse or unauthorized disclosure can result in both civil and criminal penalties. If you are not the intended recipient, be aware that any disclosure, copying, distribution or use of the content of this information is prohibited. If you have received this communication in error, please notify me immediately by email and delete the original message.
