Tom, the NRC has no regulations with release criteria. Unconditional release 
requires a determination of "no detectable". I believe some materials licensees 
have license conditions with specified minimum detection limits such as the old 
1k smearable, 5k total.  For Part 50 licensees  (commercial reactors), see Info 
Circular 81-07 for surface contamination guidance and Info Notice 85-92 for 
quantities. Volumetric releases require gamma spec to environmental levels with 
LLDs specified in the ODCM. 
If ANSI/HPS N13.12 were ever adopted . . . .
Regards, Eric Goldin, CHP



Sent from my Verizon, Samsung Galaxy smartphone
-------- Original message --------From: "Voss, Tom" <[email protected]> Date: 
4/17/17  10:54 AM  (GMT-08:00) To: David W Miller <[email protected]>, 
[email protected] Subject: [powernet] RE: RE:New HPS Instrumentation 
Section Meeting Date 


Everyone
 
I got the dates mixed up, David is correct it should be on the 10th.  But I 
still can’t find that meeting on the HPS Online Listing.  I have contacted the 
right people to get the meeting listed. 

 
Show up at the HPS meeting on July 10th and I guarantee there will be a 
discussion about the new “Instrumentation Section” of the HPS.  Perhaps in a 
hallway which is where I get my best information
 here at Los Alamos National Laboratory.
 
Thanks to David for catching my error.
 
Tom
 


From: David W Miller [mailto:[email protected]] 

Sent: Monday, April 17, 2017 11:41 AM

To: Voss, Tom <[email protected]>; [email protected]

Subject: RE:New HPS Instrumentation Section Meeting Date


 

Tom,


 


I think you mean Monday, July 10 for the new HPS Instrumentation Section 
meeting at the Raleigh HPS Annual Meeting.  I hope there is a good response to 
the instrumentation
 Section initiative.


 


Thanks for organizing the Power Reactor Section Meeting on Wednesday. 


 


David Miller


Cook RP 


American Electric Power 


217 855 3238 





From: Voss, Tom [[email protected]]

Sent: Monday, April 17, 2017 1:35 PM

To: [email protected]

Subject: [EXTERNAL] [powernet] NRC surface contamination release limits






This is an EXTERNAL email. STOP. THINK before you CLICK links or OPEN 
attachments.








Everyone
 
In the DOE we use surface contamination guidelines in 10CFR835 Appendix D, much 
earlier than 10CFR835 we used Table 1 of DOE Order 5400.5.  Our Radiation 
Protection Program document pretty much incorporates the
 values in 10CFR835 Appendix D.  Each DOE facility is required to have a 
Radiation Protection Program document but there are differences from one DOE 
facility to another.
 
Is there a comparable NRC document stating surface contamination guidelines ? 

 
What is the impact of “HRA Consultation No. 26-MF-755-00D” ?  Is that a useable 
NRC facility guide ?
 
What do the Canadian members of Powernet use for surface contamination 
guidelines ?
 
The Power Reactor Section of the HPS will meet on Wednesday July 12 from 08:30 
to 10:30 AM at the annual HPS meeting in Raleigh.  I would like to discuss this 
topic and many more at that meeting.
 
I am also trying to arrange a short Monday night (July 11) meeting of those who 
are interesting in participating in the new “Instrumentation Section” of the 
HPS.
 
Best regards
 
Tom
James (Tom) Voss
 






Reply via email to