North Anna flow calibrates annually.
We currently performance check air samplers daily when used (operational and 
mechanical checks, cal sticker, etc.).  No prior to or post flow calibrations 
are required.

Barbara J. Thompson
North Anna Power Station
1022 Haley Drive
Mineral, Va 23117
Superintendent Health Physics Technical Services
[email protected]
Phone:  540-894-2638



From: Powernet [mailto:[email protected]] On Behalf Of Mosty, 
Shari via Powernet
Sent: Tuesday, May 15, 2018 1:32 PM
To: [email protected]
Cc: Mosty, Shari
Subject: [External] [Powernet] Personal Air Samplers

Comanche Peak would like to know if your site requires a flow calibration of a 
Personal Air Sampler prior to use and post,  or only post use.

Thanks in advance!

Shari Mosty
Sr. Health Physicist
Comanche Peak Nuclear Power Plant
6322 N. FM 56
Glen Rose, Texas 76043
254.897.5204
[email protected]<mailto:[email protected]>



CONFIDENTIALITY NOTICE:  This electronic message contains information which may 
be legally confidential and or privileged and does not in any case represent a 
firm ENERGY COMMODITY bid or offer relating thereto which binds the sender 
without an additional express written confirmation to that effect.  The 
information is intended solely for the individual or entity named above and 
access by anyone else is unauthorized.  If you are not the intended recipient, 
any disclosure, copying, distribution, or use of the contents of this 
information is prohibited and may be unlawful.  If you have received this 
electronic transmission in error, please reply immediately to the sender that 
you have received the message in error, and delete it.  Thank you.
_______________________________________________
Powernet mailing list
[email protected]
http://hpspowernet.org/mailman/listinfo/powernet_hpspowernet.org

Reply via email to