Kayaknya mulai kecanduan nitir di baling-baling nih.. Apa gua bilang.. emang musti berani nyoba untuk tau faedahnya buat lu nyangkut di kincir angin. Sekali coba langsung ketagihan kan?
Tapi udahlah plik, kincir di Belanda kan lebih deket. Cukup naik sepatu jogging situ udah bisa sangkutin badan ke kincir buat nitir-nitir barang satu jam sehari. Jepang, kejauhan buat jalan kaki dari tempat pengungsian lu. --- "Bukan Pedanda" wrote: > FYI > > -- > > Japan to build world's largest offshore wind farm > > 15:19 16 January 2013 by Rob Gilhooly, Tokyo > > It's goodbye nuclear, hello renewables as Japan prepares to build > the world's largest offshore wind farm this July. > > By 2020, the plan is to build a total of 143 wind turbines on > platforms 16 kilometres off the coast of Fukushima, home to the > stricken Daiichi nuclear reactor that hit the headlines in March > 2011 when it was damaged by an earthquake and tsunami. > > The wind farm, which will generate 1 gigawatt of power once > completed, is part of a national plan to increase renewable energy > resources following the post-tsunami shutdown of the nation's 54 > nuclear reactors. Only two have since come back online. > > The project is part of Fukushima's plan to become completely energy > self-sufficient by 2040, using renewable sources alone. The > prefecture is also set to build the country's biggest solar park. > > The wind farm will surpass the 504 megawatts generated by the 140 > turbines at the Greater Gabbard farm off the coast of Suffolk, UK > currently the world's largest farm. This accolade will soon pass to > the London Array in the Thames Estuary, where 175 turbines will > produce 630 megawatts of power when it comes online later this > year. The Fukushima farm will beat this, too. > Massive construction > > The first stage of the Fukushima project will be the construction > of a 2-megawatt turbine, a substation and undersea cable > installation. The turbine will stand 200 metres high. If > successful, further turbines will be built subject to the > availability of funding. > > To get around the cost of anchoring the turbines to the sea bed, > they will be built on buoyant steel frames which will be stabilised > with ballast and anchored to the 200-metre-deep continental shelf > that surrounds the Japanese coast via mooring lines. > > Once the farm is running at full power, the intention is that it > will supply electricity to the powerful grid which Fukushima's two > nuclear power plants were connected to, reducing transmission costs. > > Project manager Takeshi Ishihara of the University of Tokyo insists > that the area's seismic activity won't be an issue for the > turbines. His team have carried out computer simulations and water > tank test to verify the safety of the turbines not just in the > event of an earthquake or tsunami but also in other extreme > conditions such as typhoons. "All extreme conditions have been > taken into consideration in the design," he says. > > Another contentious issue is the facility's impact on the fishing > industry, which has already been rocked by the nuclear accident. > Ishihara insists it is possible to turn the farm into a "marine > pasture" that would attract fish. While there was some objections > to the project by local people, Ishihara says is confident he has > won them round. "This is hard work, but will be resolved this > month," he says. "This project is important I think it is > impossible to use nuclear power in Fukushima again." > print > send > > If you would like to reuse any content from New Scientist, either > in print or online, please contact the syndication department first > for permission. New Scientist does not own rights to photos, but > there are a variety of licensing options available for use of > articles and graphics we own the copyright to. > ------------------------------------ Post message: [email protected] Subscribe : [email protected] Unsubscribe : [email protected] List owner : [email protected] Homepage : http://proletar.8m.com/Yahoo! Groups Links <*> To visit your group on the web, go to: http://groups.yahoo.com/group/proletar/ <*> Your email settings: Individual Email | Traditional <*> To change settings online go to: http://groups.yahoo.com/group/proletar/join (Yahoo! ID required) <*> To change settings via email: [email protected] [email protected] <*> To unsubscribe from this group, send an email to: [email protected] <*> Your use of Yahoo! Groups is subject to: http://docs.yahoo.com/info/terms/
