On 08:33 PM 3/02/2002 -0500, Abd ul-Rahman Lomax said:
>At 11:10 AM 2/4/2002 +1100, Ian Wilson wrote:
>>There was an attempt to improve this in one of the service packs (SP6 
>>maybe) which added the "Assign Net to Connected Copper" option in the 
>>Synchronizer.  But in my experience this seems to really slow down the synch.
>
>One would expect it to do so. That command must analyze all nets for 
>connection to free primitives, whereas otherwise the Synchronizer can 
>ignore the physical routing.

The point I am making, without saying so, is that it seems slower running 
the Synch with the Assign option set than running without and then running 
the Update primitives command after.  My one or two tests seemed to show 
massive slow down.

Ian

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
* To post a message: mailto:[EMAIL PROTECTED]
*
* To leave this list visit:
* http://www.techservinc.com/protelusers/leave.html
*
* Contact the list manager:
* mailto:[EMAIL PROTECTED]
*
* Forum Guidelines Rules:
* http://www.techservinc.com/protelusers/forumrules.html
*
* Browse or Search previous postings:
* http://www.mail-archive.com/proteledaforum@techservinc.com
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Reply via email to