Hi everyone,

We're looking for a few people to help out this Sunday with three
separate tests of the recovery system.

First, we're meeting at 11:00am in the lobby of the PSU Engineering
Building ("EB") to run two tests of the parachute by tossing it down the
5 story atrium.

Second, we're going off to Tim's house in Tigard to do a pull test on
the main bag to make sure the chute properly deploys at high speed.

We could use help, so if you have some spare time, drop by and give us a
hand. We'll be coordinating by my cell phone (listed below).

Thanks,

Andrew

-- 
-------------------------------------------------------
Andrew Greenberg

Portland State Aerospace Society (http://psas.pdx.edu/)
and...@psas.pdx.edu  P: 503.788.1343  C: 503.708.7711
-------------------------------------------------------

_______________________________________________
psas-team mailing list
psas-team@lists.psas.pdx.edu
http://lists.psas.pdx.edu/mailman/listinfo/psas-team

This list's membership is automatically generated from the memberships of the 
psas-airframe, psas-avionics, and psas-general mail lists. Visit 
http://lists.psas.pdx.edu to individually subscribe/unsubscribe yourself from 
these lists.

Reply via email to