* ISS

HTV abort during undocking, goes flying off

http://www.nasaspaceflight.com/2012/09/htv-3-aborts-iss-following-successful-resupply-mission/
http://www.youtube.com/watch?v=HfOTUGJtSmo&t=4m20s


* Mighty Eagle

http://www.youtube.com/watch?v=pjAIwtdAyQA


* Expedition 32 Landing

http://www.universetoday.com/97402/expedition-32-lands-safely-in-kazakhstan/



* Sneak peek of next Xaero vehicle from Masten

http://masten-space.com/wp/wp-content/uploads/Xaero-B.jpg


* Carmak prize won?

https://www.youtube.com/watch?v=1MVmH0bkMqE

Tuesday 9/11/2012 reached 104659' AGL as verified by the onboard Beeline GPS

Architecture:     Two stage minimum diameter - 4" booster to 3" sustainer
Motors:             Commercial motors.   Aerotech N1000 in booster
staging to Aerotech M685 in sustainer.  25 second total burn time.
Total impulse:    21,650 ns
Length:             126"
Pad weight:       61 lbs
Avionics:          (Raven+RDAS, Beeline GPS (70cm APRS), GoPro2 + WiFi
BacPac) replicated in booster and sustainer
Payload:           Smartphone+sensors with 2m APRS telemetry
Launcher:         12' rail

_______________________________________________
psas-team mailing list
psas-team@lists.psas.pdx.edu
http://lists.psas.pdx.edu/mailman/listinfo/psas-team

This list's membership is automatically generated from the memberships of the 
psas-airframe, psas-avionics, and psas-general mail lists. Visit 
http://lists.psas.pdx.edu to individually subscribe/unsubscribe yourself from 
these lists.

Reply via email to