As I understand it and has comfirmed on mysystem still running PT9,
To navigate by measure in PT, you use numpad * followed by the mumber
of the measure then return. For example, *25 return should jump u to
measure 25 in PT9. However in projects created in PT10 this doesn't
seem to work. If i open a project created in PT 9 in version 10, it
works as advertise. Create the project from scratch in version 10 and
it doesn't work. It jumps to some other determined spot in the
project. I have inserted a click track and verified that the project
is actually set to the correct tempo and everything. Anyone else still
have aPT 9 and PT 10 install that can test and verify this?