WoSign votes YES

Regards,

Richard

> On May 4, 2016, at 19:19, Doug Beattie <[email protected]> wrote:
> 
> GlobalSign votes YES
> 
> Doug
> 
>> On Apr 26, 2016, at 9:44 AM, Peter Bowen <[email protected]> wrote:
>> 
>> Thank you to HARICA and Comodo for endorsing.  With that the review period 
>> is now open.  If anyone has comments or objections, please reply on list.
>> 
>> Thanks,
>> Peter
>> 
>> Ballot 168: Baseline Requirements Corrections (Revised)
>> 
>> The following motion has been proposed by Peter Bowen of Amazon and endorsed 
>> by Dimitris Zacharopoulos of HARICA and Rich Smith of Comodo:
>> 
>> Background:
>> 
>> A number of small corrections and clarifications to the Baseline 
>> Requirements have been identified.  These are, in general, changes that 
>> reflect the existing understanding of the Baseline Requirements by the 
>> Forum.  Due to the understanding that these primarily represent existing 
>> practice, they are combined for efficiency.
>> 
>> -- MOTION BEGINS --
>> 
>> Effective the date of passage, the following modifications to the Baseline 
>> Requirements are adopted:
>> 
>> In Section 1.6.1:
>> * In the definition of "Applicant Representative", replace "and agrees to 
>> the Certificate Terms of Use" with "the Terms of Use" and append "or is the 
>> CA" at the end of the definition;
>> * In the definition of "Country", replace "sovereign nation" with "Sovereign 
>> State";
>> * In the definition of "Terms of Use", append "or is the CA" at the end of 
>> the definition;
>> 
>> In Section 1.6.3:
>> * Delete RFC2560;
>> * Insert "RFC6960, Request for Comments: 6960, X.509 Internet Public Key 
>> Infrastructure Online Certificate Status Protocol - OCSP. Santesson, Myers, 
>> Ankney, Malpani, Galperin, Adams, June 2013.";
>> * Delete X.509v3
>> * Insert "X.509, Recommendation ITU-T X.509 (10/2012) | ISO/IEC 9594-8:2014 
>> (E), Information technology – Open Systems Interconnection – The Directory: 
>> Public-key and attribute certificate frameworks." 
>> 
>> Move the content in section 3.3.1 to section 4.2.1 to become the third 
>> paragraph in 4.2.1 and leave section 3.3.1 blank.
>> 
>> In section 4.9.9, replace all occurrences of "RFC2560" with "RFC6960".
>> 
>> In section 5.2.2, insert "CA" immediately before "Private Key".
>> 
>> In section 6.1.2, append "without authorization by the Subscriber" to the 
>> end of the first sentence.
>> 
>> In section 6.1.6, update the last citation to read: "[Source: Sections 
>> 5.6.2.3.2 and 5.6.2.3.3, respectively, of NIST SP 56A: Revision 2]"
>> 
>> In section 6.2, in the second sentence, insert "CA" immediately before both 
>> instances of "Private Key".
>> 
>> In section 6.2.5, append "without authorization by the Subordinate CA" to 
>> the end of the sentence.
>> 
>> 
>> In sections 7.1.2.1(e) and 7.1.2.2(h) change the organizationName line to 
>> read:
>> -  organizationName (OID 2.5.4.10): This field MUST be present and the 
>> contents MUST contain either the Subject CA’s name or DBA as verified under 
>> Section 3.2.2.2. The CA may include information in this field that differs 
>> slightly from the verified name, such as common variations or abbreviations, 
>> provided that the CA documents the difference and any abbreviations used are 
>> locally accepted abbreviations; e.g., if the official record shows “Company 
>> Name Incorporated”, the CA MAY use “Company Name Inc.” or “Company Name”.
>> 
>> In section 7.1.2.3(d), replace the text with “The cA field MUST NOT be true."
>> 
>> Replace "Subordiate" with "Subordinate" in the title of 7.1.6.3.
>> 
>> In section 9.6.1 item 6:
>> * Insert "are the same entity or" immediately prior to "are Affiliated";
>> * Remove "and accepted".
>> 
>> In section 9.6.3, replace "agreement to the Terms of Use agreement." with 
>> "acknowledgement of the Terms of Use."
>> 
>> In section 9.6.3 item 2, replace "maintain sole control" with "assure 
>> control".
>> 
>> In the following sections, replace all occurrences of "Subscriber or Terms 
>> of Use Agreement" with "Subscriber Agreement or Terms of Use".
>> * Section 1.6.1, in the definition of "Subscriber"
>> * Section 4.1.2
>> * Section 4.9.1.1
>> * Section 4.9.11
>> * Section 9.6.1
>> * Section 9.6.3
>> 
>> -- MOTION ENDS --
>> 
>> The review period for this ballot shall commence at 1740 UTC on 26 April 
>> 2016, and will close at 2200 UTC on 3 May 2016. Unless the motion is 
>> withdrawn during the review period, the voting period will start immediately 
>> thereafter and will close at 2200 UTC on 10 May 2016. Votes must be cast by 
>> posting an on-list reply to this thread.
>> 
>> A vote in favor of the motion must indicate a clear 'yes' in the response. A 
>> vote against must indicate a clear 'no' in the response. A vote to abstain 
>> must indicate a clear 'abstain' in the response. Unclear responses will not 
>> be counted. The latest vote received from any representative of a voting 
>> member before the close of the voting period will be counted. Voting members 
>> are listed here: https://cabforum.org/members/
>> 
>> _______________________________________________
>> Public mailing list
>> [email protected]
>> https://cabforum.org/mailman/listinfo/public
> 
> _______________________________________________
> Public mailing list
> [email protected]
> https://cabforum.org/mailman/listinfo/public
> _______________________________________________
> Public mailing list
> [email protected]
> https://cabforum.org/mailman/listinfo/public
> _______________________________________________
> Public mailing list
> [email protected]
> https://cabforum.org/mailman/listinfo/public

Attachment: smime.p7s
Description: S/MIME cryptographic signature

_______________________________________________
Public mailing list
[email protected]
https://cabforum.org/mailman/listinfo/public

Reply via email to