Please do not reply directly to this email. All additional
comments should be made in the comments box of this bug.

Summary: Changes file is out of date

https://bugzilla.redhat.com/show_bug.cgi?id=661568

           Summary: Changes file is out of date
           Product: Publican
           Version: 2.5
          Platform: Unspecified
        OS/Version: Unspecified
            Status: NEW
          Severity: medium
          Priority: low
         Component: publican
        AssignedTo: jfe...@redhat.com
        ReportedBy: jfe...@redhat.com
         QAContact: rland...@redhat.com
                CC: mmcal...@redhat.com, publican-list@redhat.com
    Classification: Other
    Target Release: ---


Description of problem:
Changes are being kept in the spec file instead of the Changes file. The Change
log needs to be moved from the spec file in to Changes, and the spec file
change log should track rebuilds of the packages not code changes.

The current method means that people not using the spec file, Debian, Windows
etc, don't get a useful change log.

Version-Release number of selected component (if applicable):
2.5

-- 
Configure bugmail: https://bugzilla.redhat.com/userprefs.cgi?tab=email
------- You are receiving this mail because: -------
You are on the CC list for the bug.

_______________________________________________
publican-list mailing list
publican-list@redhat.com
https://www.redhat.com/mailman/listinfo/publican-list
Wiki: https://fedorahosted.org/publican

Reply via email to