Issue #3435 has been updated by Dan Bode.

The following report metrics currently exist:

applied
failed
restarted
total
failed_restarts
scheduled
skipped

failed can be used to indicate failure, and applied to determine if things on 
the system were modified.

I am referring to the report list view, not the view for individual reports.
----------------------------------------
Feature #3435: reports only focus on success/failure, should show applied
http://projects.puppetlabs.com/issues/3435

Author: Dan Bode
Status: Rejected
Priority: Normal
Assigned to: 
Category: 
Target version: 
Keywords: 
Branch: 


There are three main states for reports that we care about in puppet:

  - nothing happened, but puppet ran
  - puppet ran and something changed (but succeeded)
  - something failed

its important in puppet to understand when puppet is modifying systems and this 
should be introduced as a separate report view. 


-- 
You have received this notification because you have either subscribed to it, 
or are involved in it.
To change your notification preferences, please click here: 
http://projects.puppetlabs.com/my/account

-- 
You received this message because you are subscribed to the Google Groups 
"Puppet Bugs" group.
To post to this group, send email to [email protected].
To unsubscribe from this group, send email to 
[email protected].
For more options, visit this group at 
http://groups.google.com/group/puppet-bugs?hl=en.

Reply via email to