Hi All, I've a large scale puppet rollout in various locations, and I'm trying to figure out the most painless method to upgrade my puppetmasters/clients.
My main problem is that I'm not sure that I could upgrade all of the clients at the same time, and there might be some machines which would need to be upgraded at a later time (e.g. they are not on line at the time, or some machines are mission critical which will not be changed during operation time). so far, we're still using 0.24.4, I've testing 0.27 as a puppetmaster and 0.24.4 as a client, and it looks ok for now, but as 0.25 is hopefully soon, so, will there be any upgrade path between 0.24x to 0.25x? or do I really need to upgrade all of the clients / servers at the same time? Thanks, Ohad --~--~---------~--~----~------------~-------~--~----~ You received this message because you are subscribed to the Google Groups "Puppet Users" group. To post to this group, send email to [email protected] To unsubscribe from this group, send email to [email protected] For more options, visit this group at http://groups.google.com/group/puppet-users?hl=en -~----------~----~----~----~------~----~------~--~---
