https://github.com/python/cpython/commit/9c9b148f5c182978269141e54fa8591b701a3982
commit: 9c9b148f5c182978269141e54fa8591b701a3982
branch: main
author: Aleksandr Mazalov <[email protected]>
committer: StanFromIreland <[email protected]>
date: 2026-11-22T11:25:32Z
summary:

gh-161746: Use the Neri-Schneider algorithm for ordinal-to-date conversion in 
`datetime` (#161747)

Co-authored-by: Stan Ulbrych <[email protected]>

files:
A Misc/NEWS.d/next/Library/2026-11-10-13-28-10.gh-issue-161746.HxgY9R.rst
M Lib/_pydatetime.py
M Lib/test/datetimetester.py
M Modules/_datetimemodule.c

diff --git a/Lib/_pydatetime.py b/Lib/_pydatetime.py
index 5a8fec43e668a5..b974887fbe0970 100644
--- a/Lib/_pydatetime.py
+++ b/Lib/_pydatetime.py
@@ -90,67 +90,32 @@ def _ymd2ord(year, month, day):
 # pasting together 25 4-year cycles.
 assert _DI100Y == 25 * _DI4Y - 1
 
-def _ord2ymd(n):
+def _ord2ymd(ordinal):
     "ordinal -> (year, month, day), considering 01-Jan-0001 as day 1."
 
-    # n is a 1-based index, starting at 1-Jan-1.  The pattern of leap years
-    # repeats exactly every 400 years.  The basic strategy is to find the
-    # closest 400-year boundary at or before n, then work with the offset
-    # from that boundary to n.  Life is much clearer if we subtract 1 from
-    # n first -- then the values of n at 400-year boundaries are exactly
-    # those divisible by _DI400Y:
+    # Neri and Schneider's algorithm, https://doi.org/10.1002/spe.3172.
+    # ord_to_ymd() in Modules/_datetimemodule.c does the same steps.
     #
-    #     D  M   Y            n              n-1
-    #     -- --- ----        ----------     ----------------
-    #     31 Dec -400        -_DI400Y       -_DI400Y -1
-    #      1 Jan -399         -_DI400Y +1   -_DI400Y      400-year boundary
-    #     ...
-    #     30 Dec  000        -1             -2
-    #     31 Dec  000         0             -1
-    #      1 Jan  001         1              0            400-year boundary
-    #      2 Jan  001         2              1
-    #      3 Jan  001         3              2
-    #     ...
-    #     31 Dec  400         _DI400Y        _DI400Y -1
-    #      1 Jan  401         _DI400Y +1     _DI400Y      400-year boundary
-    n -= 1
-    n400, n = divmod(n, _DI400Y)
-    year = n400 * 400 + 1   # ..., -399, 1, 401, ...
-
-    # Now n is the (non-negative) offset, in days, from January 1 of year, to
-    # the desired date.  Now compute how many 100-year cycles precede n.
-    # Note that it's possible for n100 to equal 4!  In that case 4 full
-    # 100-year cycles precede the desired day, which implies the desired
-    # day is December 31 at the end of a 400-year cycle.
-    n100, n = divmod(n, _DI100Y)
-
-    # Now compute how many 4-year cycles precede it.
-    n4, n = divmod(n, _DI4Y)
-
-    # And now how many single years.  Again n1 can be 4, and again meaning
-    # that the desired day is December 31 at the end of the 4-year cycle.
-    n1, n = divmod(n, 365)
-
-    year += n100 * 100 + n4 * 4 + n1
-    if n1 == 4 or n100 == 4:
-        assert n == 0
-        return year-1, 12, 31
-
-    # Now the year is correct, and n is the offset from January 1.  We find
-    # the month via an estimate that's either exact or one too large.
-    leapyear = n1 == 3 and (n4 != 24 or n100 == 3)
-    assert leapyear == _is_leap(year)
-    month = (n + 50) >> 5
-    preceding = _DAYS_BEFORE_MONTH[month] + (month > 2 and leapyear)
-    if preceding > n:  # estimate is too large
-        month -= 1
-        preceding -= _DAYS_IN_MONTH[month] + (month == 2 and leapyear)
-    n -= preceding
-    assert 0 <= n < _days_in_month(year, month)
-
-    # Now the year and month are correct, and n is the offset from the
-    # start of that month:  we're done!
-    return year, month, n+1
+    # Count days from 0000-03-01, so that the leap day is the last day of
+    # its year. 0001-01-01 is day 306.
+    days = ordinal + 305
+
+    # Centuries average _DI400Y/4 days: three of 36524, then one of 36525.
+    century, rest = divmod(4 * days + 3, _DI400Y)
+    day_of_century = rest // 4
+
+    # Likewise, years average _DI4Y/4 days: three of 365, then one of 366.
+    year_of_century, rest = divmod(4 * day_of_century + 3, _DI4Y)
+    day_of_year = rest // 4
+
+    # From March, month lengths repeat 31, 30, 31, 30, 31 (153 days).
+    # 461 = 3*153 + 2 numbers the months from 3 (March) to 14 (February).
+    month, rest = divmod(5 * day_of_year + 461, 153)
+    day = rest // 5 + 1
+    year = 100 * century + year_of_century
+    if month > 12:
+        return year + 1, month - 12, day
+    return year, month, day
 
 # Month and day names.  For localized versions, see the calendar module.
 _MONTHNAMES = [None, "Jan", "Feb", "Mar", "Apr", "May", "Jun",
diff --git a/Lib/test/datetimetester.py b/Lib/test/datetimetester.py
index 00a9d2bca3f477..a57be7c7f12c00 100644
--- a/Lib/test/datetimetester.py
+++ b/Lib/test/datetimetester.py
@@ -1434,6 +1434,23 @@ def test_ordinal_conversions(self):
                     self.assertEqual(d, self.theclass.fromordinal(n))
                     n += 1
 
+        # Check the first and last days of every month in years at the
+        # start and the end of the 4-, 100- and 400-year cycles.
+        for year in (1, 3, 4, 5, 99, 100, 101, 399, 400, 401, 1899, 1900,
+                     1901, 1999, 2001, 2100, 2399, 2400, 9996, 9999):
+            isleap = year % 4 == 0 and (year % 100 != 0 or year % 400 == 0)
+            n = self.theclass(year, 1, 1).toordinal()
+            for month, maxday in zip(range(1, 13), dim):
+                if month == 2 and isleap:
+                    maxday += 1
+                for day, ordinal in (1, n), (maxday, n + maxday - 1):
+                    with self.subTest(year=year, month=month, day=day):
+                        d = self.theclass(year, month, day)
+                        self.assertEqual(d.toordinal(), ordinal)
+                        self.assertEqual(d, self.theclass.fromordinal(ordinal))
+                n += maxday
+            self.assertEqual(n, self.theclass(year, 12, 31).toordinal() + 1)
+
     def test_extreme_ordinals(self):
         a = self.theclass.min
         a = self.theclass(a.year, a.month, a.day)  # get rid of time parts
@@ -1455,6 +1472,13 @@ def test_extreme_ordinals(self):
 
         self.assertRaises(ValueError, lambda: a.fromordinal(aord + 1))
 
+        # Past the maximum, the error still reports the year of the ordinal.
+        for n, year in ((aord + 1, 10000), (aord + 146097 + 1, 10400),
+                        (2**31 - 1, 5879611)):
+            with self.subTest(n=n):
+                with self.assertRaisesRegex(ValueError, rf"\b{year}\b"):
+                    self.theclass.fromordinal(n)
+
         b = a - timedelta(days=1)
         self.assertEqual(b.toordinal(), aord - 1)
         self.assertEqual(b, self.theclass.fromordinal(aord - 1))
diff --git 
a/Misc/NEWS.d/next/Library/2026-11-10-13-28-10.gh-issue-161746.HxgY9R.rst 
b/Misc/NEWS.d/next/Library/2026-11-10-13-28-10.gh-issue-161746.HxgY9R.rst
new file mode 100644
index 00000000000000..293bf5fb27a755
--- /dev/null
+++ b/Misc/NEWS.d/next/Library/2026-11-10-13-28-10.gh-issue-161746.HxgY9R.rst
@@ -0,0 +1,3 @@
+Speed up :meth:`datetime.datetime.fromordinal` by about 15% (30% in the
+pure-Python implementation) by using the `Neri–Schneider algorithm
+<https://doi.org/10.1002/spe.3172>`__.
diff --git a/Modules/_datetimemodule.c b/Modules/_datetimemodule.c
index 091da059afd34b..6162ace0b16d64 100644
--- a/Modules/_datetimemodule.c
+++ b/Modules/_datetimemodule.c
@@ -471,88 +471,35 @@ days_before_month(int year, int month)
 #define DI100Y  36524   /* _PyTime_DaysBeforeYear(101); days in 100 years */
 #define DI400Y  146097  /* _PyTime_DaysBeforeYear(401); days in 400 years  */
 
-/* ordinal -> year, month, day, considering 01-Jan-0001 as day 1. */
+/* ordinal -> year, month, day, considering 01-Jan-0001 as day 1.
+ *
+ * Neri and Schneider's algorithm, https://doi.org/10.1002/spe.3172; see
+ * _ord2ymd() in Lib/_pydatetime.py for an explanation of the steps.
+ *
+ * The intermediate values only fit in 32 bits for small ordinals;
+ * iso_to_ymd() passes the largest, MAXORDINAL + 2 (10000-01-02).
+ */
 static void
 ord_to_ymd(int ordinal, int *year, int *month, int *day)
 {
-    int n, n1, n4, n100, n400, leapyear, preceding;
-
-    /* ordinal is a 1-based index, starting at 1-Jan-1.  The pattern of
-     * leap years repeats exactly every 400 years.  The basic strategy is
-     * to find the closest 400-year boundary at or before ordinal, then
-     * work with the offset from that boundary to ordinal.  Life is much
-     * clearer if we subtract 1 from ordinal first -- then the values
-     * of ordinal at 400-year boundaries are exactly those divisible
-     * by DI400Y:
-     *
-     *    D  M   Y            n              n-1
-     *    -- --- ----        ----------     ----------------
-     *    31 Dec -400        -DI400Y       -DI400Y -1
-     *     1 Jan -399         -DI400Y +1   -DI400Y      400-year boundary
-     *    ...
-     *    30 Dec  000        -1             -2
-     *    31 Dec  000         0             -1
-     *     1 Jan  001         1              0          400-year boundary
-     *     2 Jan  001         2              1
-     *     3 Jan  001         3              2
-     *    ...
-     *    31 Dec  400         DI400Y        DI400Y -1
-     *     1 Jan  401         DI400Y +1     DI400Y      400-year boundary
-     */
-    assert(ordinal >= 1);
-    --ordinal;
-    n400 = ordinal / DI400Y;
-    n = ordinal % DI400Y;
-    *year = n400 * 400 + 1;
-
-    /* Now n is the (non-negative) offset, in days, from January 1 of
-     * year, to the desired date.  Now compute how many 100-year cycles
-     * precede n.
-     * Note that it's possible for n100 to equal 4!  In that case 4 full
-     * 100-year cycles precede the desired day, which implies the
-     * desired day is December 31 at the end of a 400-year cycle.
-     */
-    n100 = n / DI100Y;
-    n = n % DI100Y;
-
-    /* Now compute how many 4-year cycles precede it. */
-    n4 = n / DI4Y;
-    n = n % DI4Y;
-
-    /* And now how many single years.  Again n1 can be 4, and again
-     * meaning that the desired day is December 31 at the end of the
-     * 4-year cycle.
-     */
-    n1 = n / 365;
-    n = n % 365;
-
-    *year += n100 * 100 + n4 * 4 + n1;
-    if (n1 == 4 || n100 == 4) {
-        assert(n == 0);
-        *year -= 1;
-        *month = 12;
-        *day = 31;
-        return;
+    assert(1 <= ordinal && ordinal <= MAXORDINAL + 2);
+    const uint32_t days = (uint32_t)ordinal + 305;
+    const uint32_t century = (4 * days + 3) / DI400Y;
+    const uint32_t day_of_century = (4 * days + 3) % DI400Y / 4;
+    const uint32_t year_of_century = (4 * day_of_century + 3) / DI4Y;
+    const uint32_t day_of_year = (4 * day_of_century + 3) % DI4Y / 4;
+    const uint32_t m = (5 * day_of_year + 461) / 153;
+    const uint32_t d = (5 * day_of_year + 461) % 153 / 5 + 1;
+    const uint32_t y = 100 * century + year_of_century;
+    if (m > 12) {  /* January or February */
+        *year = (int)(y + 1);
+        *month = (int)(m - 12);
     }
-
-    /* Now the year is correct, and n is the offset from January 1.  We
-     * find the month via an estimate that's either exact or one too
-     * large.
-     */
-    leapyear = n1 == 3 && (n4 != 24 || n100 == 3);
-    assert(leapyear == is_leap(*year));
-    *month = (n + 50) >> 5;
-    preceding = (_days_before_month[*month] + (*month > 2 && leapyear));
-    if (preceding > n) {
-        /* estimate is too large */
-        *month -= 1;
-        preceding -= days_in_month(*year, *month);
+    else {
+        *year = (int)y;
+        *month = (int)m;
     }
-    n -= preceding;
-    assert(0 <= n);
-    assert(n < days_in_month(*year, *month));
-
-    *day = n + 1;
+    *day = (int)d;
 }
 
 /* year, month, day -> ordinal, considering 01-Jan-0001 as day 1. */
@@ -3444,7 +3391,16 @@ datetime_date_fromordinal_impl(PyTypeObject *type, int 
ordinal)
         PyErr_SetString(PyExc_ValueError, "ordinal must be >= 1");
         return NULL;
     }
-    ord_to_ymd(ordinal, &year, &month, &day);
+    if (ordinal <= MAXORDINAL) {
+        ord_to_ymd(ordinal, &year, &month, &day);
+    }
+    else {
+        /* Out of range, but compute the year for the error message.
+         * The calendar repeats every 400 years (DI400Y days). */
+        int cycles = (ordinal - 1) / DI400Y;
+        ord_to_ymd(ordinal - cycles * DI400Y, &year, &month, &day);
+        year += 400 * cycles;
+    }
     return new_date_subclass_ex(year, month, day, type);
 }
 

_______________________________________________
Python-checkins mailing list -- [email protected]
To unsubscribe send an email to [email protected]
https://mail.python.org/mailman3//lists/python-checkins.python.org
Member address: [email protected]

Reply via email to