Sorry for top posting. Please stop posting the same mail on multiple list, this is quite disturbing for most people who are subscribed to the same lists.
In your case, I would recommend using only qa@ since the theme is solely qa related. rgds jan I. On 11 August 2014 06:28, Yuzhen Fan <[email protected]> wrote: > Hi All, > > AOO 4.1.1 Full Path Regression Test(FPR) have been closed on Aug 8, we > continue testing RC1 as wait for RC2, here is the weekly update (8/5 - > 8/11): > > *Test execution:* > We have assigned 176 text executions to about 20 volunteers, and completed > about 75.6% in execution (133 test executions done). Although we do not > meet the 100% completion goal before planned date, Aug 8, the execution > coverage and test result so far are good among platforms. > > > Test Category Total Not Run Passed Failed Blocked > Completed [%] > AOO Calc 53 13 36 2 2 75.47 > Fidelity 5 1 2 0 2 80.00 > AOO Impress 68 17 39 12 0 75.00 > AOO Writer 50 12 36 2 0 76.00 > Total 176 43 113 16 4 75.60 > > > Platform Total Not Run Passed Failed Blocked Completed > [%] > MacOS X 32 13 15 4 0 59.38 > Redhat Linux 32bit 12 3 8 1 0 75.00 > Redhat Linux 64bit 45 13 23 9 0 71.11 > Ubuntu Linux 64bit 18 1 13 1 3 94.44 > Windows 7 36 7 29 0 0 80.56 > Windows 8 17 2 13 1 1 88.24 > Windows Server 2012 16 4 12 0 0 75.00 > Total 176 43 113 16 4 75.60 > > *Defect summary:* > 1. We have verified 58 of 4.1.1 resolved showstopper bugs (Total 75 as of > Aug 11, increased 2 since Aug 4. Backlog is 17, none for function bugs) > > https://issues.apache.org/ooo/buglist.cgi?cmdtype=dorem&list_id=153261&namedcmd=4.1.1_release_blocker%2B%3F&remaction=run&sharer_id=249089 > > *Issues & quality highlight:* > 1. We have completed to verify all function defects! We still need defect > verification volunteers, to verify language bugs and API/code level bugs > 2. Test execution volunteers on Mac & Redhat Linux 64bitMac have caught up > this week > 3. No critical and potential showstopper have been reported, every thing is > good so far > > *Volunteer status: * > 1. We have total 20 test execution volunteers joined in FPR execution work > since June 24, 2 are from Apache OpenOffice Forum > 2. We have total 16 defect verification volunteers joined in 4.1.1 resolved > showstopper bug verification work since June 23 > > *Plan for next week:* > 1. Continue testing with RC1, by executing not-run test cases in FPR > 2. Switch testing with RC2 once it is available > 3. Continue to organize the RC test and bug verification > > Thank you all for effort provided last week, especially on Mac/Linux > Redhat! > > Regards, > Yu Zhen >