Am 26.10.2016 um 12:29 hat Alberto Garcia geschrieben: > After a successful block-commit operation all nodes between top and > base are removed from the backing chain, and top's overlay needs to > be updated to point to base. Because of that we should prevent other > block jobs from messing with them. > > This patch blocks all operations in these nodes in commit_start(). > > Signed-off-by: Alberto Garcia <[email protected]>
Reviewed-by: Kevin Wolf <[email protected]>
