The process leading up to the release of 1.9.0 is detailed below. Package maintainers may want to take notice of important dates and make sure that their packages still work with the alpha/beta releases or work on making a 1.9.x comaptible version.
As usual, everybody is encouraged to try out the preliminary releases and report back so that we can get the last wrinkles ironed out before release. Mar 7: Declare start of release process. The build process is assumed to be essentially in place at this time. There is a "grand feature" freeze (minor tweaks can be applied, but no wholesale restructuring or API changes). Notice that wrapping a package in a namespace is a grand feature, and so is meddling with the event loop. Package maintainers should start adapting to any changes in base. Start making R-1.9.0alpha.tgz packages automatically available. Mar 21: Feature freeze, simultaneously on base and recommended packages. It is assumed that all recommended packages pass their checks at this point. The API should not be touched. Start making R-1.9.0beta.tgz packages automatically available. Mar 28: Code freeze. Only critical and/or trivial bugs fixed from this time onwards. Configure/make should only be touched in emergencies. Apr 4: Release. -- O__ ---- Peter Dalgaard Blegdamsvej 3 c/ /'_ --- Dept. of Biostatistics 2200 Cph. N (*) \(*) -- University of Copenhagen Denmark Ph: (+45) 35327918 ~~~~~~~~~~ - ([EMAIL PROTECTED]) FAX: (+45) 35327907 ______________________________________________ [EMAIL PROTECTED] mailing list https://www.stat.math.ethz.ch/mailman/listinfo/r-devel