hi working with R-2.1.1 on winxp, in a loop I draw to a trellis.device which takes some time. After the drawing I call savePlot(). it seems, the loop is too fast for the savePlot() call to finish. Is there any solution for such a problem? Calling the same steps outside the loop, works fine. many thanks
christoph -- ______________________________________________ [email protected] mailing list https://stat.ethz.ch/mailman/listinfo/r-help PLEASE do read the posting guide! http://www.R-project.org/posting-guide.html
