hi
working with R-2.1.1 on winxp, in a loop I draw to a trellis.device which
takes some time. After the drawing I call savePlot().
it seems, the loop is too fast for the savePlot() call to finish. Is there
any solution for such a problem? Calling the same steps outside the loop,
works fine.
many thanks

christoph 

--

______________________________________________
[email protected] mailing list
https://stat.ethz.ch/mailman/listinfo/r-help
PLEASE do read the posting guide! http://www.R-project.org/posting-guide.html

Reply via email to