Tuesday, October 8, 2019
Dear R:BASE Community,
What can be perceived as a separate product unto itself, one of the more
organized form controls in R:BASE X.5 (Version 10.5) is the DB Task
Tracker, as the table-driven task and scheduling component.
Image Example:
https://www.rbase.com/rbgx5/images/DBTaskTracker_Example.png
The DB Task Tracker is an advanced task/event scheduling and tracking tool
to build R:BASE modules for live production control, timetables,
itineraries, and more. Primary features include:
. 6 view types for tasks: Days, Week, Multi-Week, Year, Gantt (horizontal
bars along a time axis), and Time Grid (ordered along a timescale)
. Task Tree - Powerful tree-base display grid with filtering and
drag-and-drop support
. Multiple Resources Display - The multiple resources display enables
your end users to browse several plans (for any entity such as an
individual or office location, etc) simultaneously.
. Date Navigator - The DB Task Tracker built-in date navigator offers
extremely intuitive access to desired time frames.
. Advanced Appearance Settings - Control-specific themes and many other
visual options apply artistic and professional representations upon events.
Online Help:
https://www.rbase.com/support/rsyntax/rbgx5/db_task_tracker.html
Please reach out to R:BASE Technologies with any DB Task Tracker questions!
Best regards,
John Minyo II
Customer Service
R:BASE Technologies, Inc.
P: 1+724.733.0053
https://www.rbase.com
https://www.facebook.com/rbase
--
For group guidelines, visit
http://www.rbase.com/support/usersgroup_guidelines.php
---
You received this message because you are subscribed to the Google Groups "RBASE-L" group.
To unsubscribe from this group and stop receiving emails from it, send an email
to [email protected].
To view this discussion on the web visit
https://groups.google.com/d/msgid/rbase-l/6.2.0.14.2.20191008140144.19576ac8%40mail.rbase.com.