Tuesday, October 8, 2019

Dear R:BASE Community,

What can be perceived as a separate product unto itself, one of the more organized form controls in R:BASE X.5 (Version 10.5) is the DB Task Tracker, as the table-driven task and scheduling component.

Image Example:
https://www.rbase.com/rbgx5/images/DBTaskTracker_Example.png

The DB Task Tracker is an advanced task/event scheduling and tracking tool to build R:BASE modules for live production control, timetables, itineraries, and more. Primary features include:

. 6 view types for tasks: Days, Week, Multi-Week, Year, Gantt (horizontal bars along a time axis), and Time Grid (ordered along a timescale) . Task Tree - Powerful tree-base display grid with filtering and drag-and-drop support . Multiple Resources Display - The multiple resources display enables your end users to browse several plans (for any entity such as an individual or office location, etc) simultaneously. . Date Navigator - The DB Task Tracker built-in date navigator offers extremely intuitive access to desired time frames. . Advanced Appearance Settings - Control-specific themes and many other visual options apply artistic and professional representations upon events.

Online Help:
https://www.rbase.com/support/rsyntax/rbgx5/db_task_tracker.html

Please reach out to R:BASE Technologies with any DB Task Tracker questions!

Best regards,

John Minyo II
Customer Service
R:BASE Technologies, Inc.
P: 1+724.733.0053
https://www.rbase.com
https://www.facebook.com/rbase
--
For group guidelines, visit 
http://www.rbase.com/support/usersgroup_guidelines.php
--- You received this message because you are subscribed to the Google Groups "RBASE-L" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To view this discussion on the web visit 
https://groups.google.com/d/msgid/rbase-l/6.2.0.14.2.20191008140144.19576ac8%40mail.rbase.com.

Reply via email to