Bob,

If you want the percentage to display when using the LED option,
place a Static Text Control next to the Meter Control and update its Caption 
property when you update the Meter Control.

The percentage would be illegible on the led display anyway.

Dennis McGrath

From: [email protected] [mailto:[email protected]] On Behalf Of 
[email protected]
Sent: Wednesday, November 26, 2014 10:13 AM
To: RBASE-L Mailing List
Subject: [RBASE-L] - Re: Sample Application: Using Form Meter Control 
toDisplayProgress Bar

Thank you for the samples.
I believe they confirm what I was seeing as the expected result.

The segment options are applicable to only to the LED type.
The show percent option is applicable only to the Normal and 3D bar type.

Thus displaying the percent and segment is not a supported option at this time.

Thank you again,
Bob

________________________________
From: "A. Razzak Memon" <[email protected]<mailto:[email protected]>>
To: "RBASE-L Mailing List" <[email protected]<mailto:[email protected]>>
Sent: Wednesday, November 26, 2014 9:50:52 AM
Subject: [RBASE-L] - Sample Application: Using Form Meter Control to 
DisplayProgress Bar

Wednesday, November 26, 2014

Sample Application: Using Form Meter Control to Display Progress Bar
Product..: R:BASE eXtreme 9.5 (32/64)
Build....: 9.5.4.31125 or higher
Section..: Form Controls (Meter)

Based on R:BASE eXtreme 9.5 External Form File, a sample application
to demonstrate the use of form Meter control to display progress bar
is now available.

Sample Applications: http://www.Razzak.com/SampleApplications/

Application Title: Using Form Meter Control to Display Progress Bar

Date Posted: 11/26/2014

Key Features:

    . Three different styles to use Form Meter Control
    . PROPERTY <ComponentID> CAPTION .vCurrentStep
    . PROPERTY <MeterControlCompID> VALUE .vProgress

Steps:

01. Unzip the file in a temporary directory

     ProgressBarForm.zip includes the following files:
     . ProgressBarForm.RMD
     . ProgressBarForm.RFF
     . ProgressBarForm.TXT

02. Start RBG95 (Update 4 or higher)

03. Switch the default directory for temporary folder with unzipped files

04. Using the Database Explorer|Command Files, or at the R> Prompt:

     RUN ProgressBarForm.RMD
     -- This will demonstrate the use of Meter Control and Progress Bar

Enjoy!

Razzak.

www.rbase.com<http://www.rbase.com>
www.facebook.com/rbase<http://www.facebook.com/rbase>
www.RazzakMemon.com<http://www.RazzakMemon.com>
--
30+ years of continuous innovation!
15 Years of R:BASE Technologies, Inc. making R:BASE what it is today!
--



Reply via email to