well i think i found a way to get the mount done. i'm going to go with my original idea of attaching 2 steel rods from the washer (that's mounted on the mantle), but on the top, i'm going to have a tab welded to the one rod to the one side to where it overlays the e-trigger frame. there is an area on it where i can drill and thread for a set of thumb screws. I know i have thumb screws around here somewhere, so i'll start looking for them, i'll cut the rods to length (the bottom one will just be for some extra lower support), find my flat bar stock, cut a pieces of that to size and drill the holes for the thumb screws to pass through (would be a bit harder to do ones it's all welded together). once that's done i can start laying out the servo for the elevation and start getting the marker wired in I was hoping UPS was going to show up today, they have a box of sprockets for me for the trany, driver sprocket and idler wheel (sprocket). guess there's always monday...... Chris, _Odyssey Slipways_ (http://hometown.aol.com/odysseyslipways/index.html)
-- You are currently subscribed to the "R/C Tank Combat" group. To post a message, send email to [email protected] To unsubscribe, send email to [email protected] Visit the group at http://groups.google.com/group/rctankcombat
