Thanks to those who helped me out. I had a stickler inspector to deal with.
For instance, he interpreted all inverters (-8- SunnyBoy 7000 watt) to
require a grounding electrode connected from each inverter chassis to
building steel. Anybody else required to do this out there? The good thing
is final approval was obtained.

 

  _____  

From: [email protected]
[mailto:[email protected]] On Behalf Of Kirk
Herander, VSE
Sent: Sunday, February 01, 2009 7:40 AM
To: 'RE-wrenches'
Subject: [RE-wrenches] online NEC book?

 

Hello,

Is there anywhere on line to find the code book in pdf or other readable
format? I'm out of town and don't have mine with me. Thanks.

 

Kirk Herander

Vermont Solar Engineering

802.863.1202

NABCEP(tm) Certified Solar Installer

NYSERDA-eligible Installer

VT Solar Incentive Program Partner

 

_______________________________________________
List sponsored by Home Power magazine

List Address: [email protected]

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to