I have an installation that is a ground mount on a berm with a man-made pond between the array and the BOS. The pond is about 4 feet deep. How would you wrenches make this run? in weighted conduit with primer and glued joints? use boring and go under? out of conduit with wire directly in the water?
Does code have anything to say about this specifically? Thanks as always. -- Thanks, Kris Schmid Legacy Solar, LLC 864 Clam Falls Trail Frederic, WI 54837 715-653-4295 www.legacysolar.com [email protected]
_______________________________________________ List sponsored by Home Power magazine List Address: [email protected] Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org