I have an installation that is a ground mount on a berm with a man-made pond
between the array and the BOS.  The pond is about 4 feet deep.  How would
you wrenches make this run? in weighted conduit with primer and glued
joints? use boring and go under? out of conduit with wire directly in the
water?

Does code have anything to say about this specifically?

Thanks as always.

-- 
Thanks,
Kris Schmid

Legacy Solar, LLC
864 Clam Falls Trail
Frederic, WI 54837
715-653-4295
www.legacysolar.com
[email protected]