How about a Dump Load for the Whisper 500. One for each TS60. We have had good luck with this on our wind gen set up (Skystream) 2.4 kw peak charging betteries Jeremy ------Original Message------ From: Larry Crutcher, Starlight Solar Power Systems Sender: [email protected] To: [email protected] ReplyTo: [email protected] Subject: [RE-wrenches] Diversion load for AC coupled system Sent: Nov 29, 2011 6:35 PM
Hello Wrenches, I would like some advice on diversion load control of 3800 watts of PV solar. The battery bank is 48 volts and the battery inverter is the MS4448PAE. This will AC couple with a grid tied inverter during an outage. Magnum Energy recommends the addition of a dump load for safe battery voltage control. The customer may leave the home unattended for weeks so I am looking for reliability here. Quality, as well. A pair of Tristar 60's should be suitable for the 3.8kW output but I haven't been able to find a load that is sized for this job. I welcome any advice on this subject. Thanks in advance. Larry Crutcher Starlight Solar Power Systems _______________________________________________ List sponsored by Home Power magazine List Address: [email protected] Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org Sent via BlackBerry. Sorry for typos and shorthand! _______________________________________________ List sponsored by Home Power magazine List Address: [email protected] Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org

