Wrenchers,
I recently installed a 21KW system and grounded the roof mounted inverters to 
the steel of the building.  The inspector pointed out that the steel of the 
building needs to be grounded to the Grounding Electrode that the service is 
grounded to which in this case is the water pipe.  What size ground is needed 
from the Steel of the building to the water pipe?  Is the same size GEC run 
from the inverters sufficient or do I need to match the size of the GEC for the 
building service?
Al Frishman
AeonSolar

(917) 699-6641 - cell
(888) 460-2867
www.aeonsolar.com