I would like to here some thoughts on monitoring the production a XW in grid 
tie with battery backup mode. I normally use the Sunny Island for my grid tie 
with battery backup systems and am considering going with the XW on my next 
one.  Just wondering where in the system one would wire the AC PV Production 
meter to best represent the amount of power sold to the grid.  We have 
performance based incentives around here that require metering of the power 
going back to the grid.  With the SI systems this is easily accomplished by 
putting the required meter after the sunny boy before going to the critical 
loads panel.  Any ideas about how to accomplish this with the DC coupled XW 
system? Your thoughts would be greatly appreciated.    

Aaron Mandelkorn
NABCEP Certified PV Installer
Owner / Operator

Renewable Energy Outfitters
Box 65 Salida, CO. 81201
(970)596-3744
reoso...@gmail.com
www.reosolar.com














_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to