Wrenches, I would like to here some thoughts on monitoring the production a XW in grid tie with battery backup mode. I normally use the Sunny Island for my grid tie with battery backup systems and am considering going with the XW on my next one. Just wondering where in the system one would wire the AC PV Production meter to best represent the amount of power sold to the grid. We have performance based incentives around here that require metering of the power going back to the grid. With the SI systems this is easily accomplished by putting the required meter after the sunny boy before going to the critical loads panel. Any ideas about how to accomplish this with the DC coupled XW system? Your thoughts would be greatly appreciated.
Aaron Mandelkorn NABCEP Certified PV Installer Owner / Operator Renewable Energy Outfitters Box 65 Salida, CO. 81201 (970)596-3744 reoso...@gmail.com www.reosolar.com
_______________________________________________ List sponsored by Home Power magazine List Address: RE-wrenches@lists.re-wrenches.org Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org