I know I saw a thread on this but I cannot find it in the archive. I have inherited a customer that has a four inverter Outback system, 240V 1 Phase, on a 208Y120V 3 Phase 4 Wire system, that constantly has problems. A 208V to 240V 1 phase transformer was installed feeding the input, but the system still struggles. Will this system ever work correctly as is, or does it need to be rewired for 3 phase and use the third inverter as a spare. This would include a lot of work rewiring the output panel. Any ideas?
W.C. (Bill) Turberville P.E. President ECE Solar Electrical Contracting Enterprises LLC 3080 Stage Post Road Suite 107 Bartlett, TN 38133 901-348-9230 ext 101 phone 901-348-2192 fax 901-289-6346 cell [email protected]
_______________________________________________ List sponsored by Home Power magazine List Address: [email protected] Change email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org

