"We were hired just to install the system by a local firm that designed and 
sold the system and have had a bear of a time getting paid from anyone. "

this is why i never touch materials i do not sell, or install designs i did not 
do.
 


todd
 
 
 
 
On Tuesday, May 7, 2013 10:57pm, "Jesse Dahl" <[email protected]> said:



I installed 2 10kW 208V powerone inverters this summer and both failed.  The 
first one failed right out of the box and the second made it a few months.  We 
were hired just to install the system by a local firm that designed and sold 
the system and have had a bear of a time getting paid from anyone.

Jesse


Sent from Finest Planet WebMail.
_______________________________________________
List sponsored by Home Power magazine

List Address: [email protected]

Change email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to