"We were hired just to install the system by a local firm that designed and sold the system and have had a bear of a time getting paid from anyone. "
this is why i never touch materials i do not sell, or install designs i did not do. todd On Tuesday, May 7, 2013 10:57pm, "Jesse Dahl" <[email protected]> said: I installed 2 10kW 208V powerone inverters this summer and both failed. The first one failed right out of the box and the second made it a few months. We were hired just to install the system by a local firm that designed and sold the system and have had a bear of a time getting paid from anyone. Jesse Sent from Finest Planet WebMail.
_______________________________________________ List sponsored by Home Power magazine List Address: [email protected] Change email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org