Hello All,

In the past we have bonding metal roofing with approved lay-in lugs and
bare copper install at the top of a pan underneath the ridge cap.  We have
an installation on a commercial building where the roof is quite long, and
the array is on a "middle" section of the roofing, meaning the pan does not
go all the way to the ridge cap.  I'm interested to hear what grounding
methods you wise Wrenches may suggest for bonding the metal roofing under
this array.

The roof is not standing seam clamp compatible, the structure of the
building is steel, the AHJ has specifically asked for this, and the roofing
is not already considered "bonded" to the building.

Thanks!
Phil
*
*
*Phil Schneider*
Creative Energies
mobile 307.438.1195
Lander,  Wyoming  307.332.3410
Victor, Idaho  208.354.3001
Salt Lake City, Utah  801.487.6489
* <http://www.cesolar.com/> *

**
_______________________________________________
List sponsored by Home Power magazine

List Address: [email protected]

Change email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to