I'm not clear on the specific situation the inspector was speaking about - it could have been inter-module conductors under the array or it could have been between an array and remote junction box.
It sounds like generally speaking they should be run together. -August *From:* re-wrenches-boun...@lists.re-wrenches.org [mailto: re-wrenches-boun...@lists.re-wrenches.org] *On Behalf Of *jay peltz *Sent:* Tuesday, November 19, 2013 10:33 AM *To:* RE-wrenches *Subject:* Re: [RE-wrenches] PV Wiring methods Hi August, I can only assume that the inspectors are talking about say running a return leg which would have no pair back to the combiner/junction box? jay peltz power On Nov 19, 2013, at 9:38 AM, August Goers wrote: Hi All – On a related note, I’ve become good friends with some of the inspectors in San Francisco and they called me yesterday with a question. Is it okay to run *individual* DC conductors through EMT for wire management purposes? We have always run paired positive and negative conductors in conduit so the question had never occurred to me. Obviously, you have to bond both ends of the conduit if it is over 250 v. I know that AC would have induction issues with running individual conductors but I’m not sure with DC. Thanks, August August Goers Principal Luminalt Energy Corporation o: 415.641.4000 m: 415.559.1525 www.luminalt.com *From:* re-wrenches-boun...@lists.re-wrenches.org [mailto: re-wrenches-boun...@lists.re-wrenches.org] *On Behalf Of *William Miller *Sent:* Monday, November 18, 2013 11:33 PM *To:* 'RE-wrenches' *Subject:* Re: [RE-wrenches] PV Wiring methods Bill: There is no need to stuff MC4 cables into standard conduit. You can either slot the pipe using our easy method or install bulkhead type connectors. The connectors are readily available. I get them from PV Cables in Northern California.. Wire routing problems and some solutions can be found on our web-site: http://millersolar.com/MillerSolar/practices/PV_wiring/_PV_Wiring2.html Since the industry won’t provide wire management solutions, we are making our own. Questions: Just write or call. William Miller *From:* re-wrenches-boun...@lists.re-wrenches.org [ mailto:re-wrenches-boun...@lists.re-wrenches.org<re-wrenches-boun...@lists.re-wrenches.org> ] *On Behalf Of *frenergy *Sent:* Thursday, November 14, 2013 7:46 AM *To:* RE-wrenches *Subject:* Re: [RE-wrenches] PV Wiring methods William, Bill....from another Bill, Two things: For the rest of us (maybe it's just me?!) that's still trying to figure out how (or why) to stuff a MC4 connector into conduit and my hesitation in using SS wire ties for fear of the sharp edges cutting or chaffing into cables, I'm open for advice. Any wire I use on the roof is rated for that type of service and I have some off-grid systems that have been in the sun for some 25 years where the wire still looks nearly new even when flexing it to look for checking/cracks. It seems the wire/insulation can take it, thus it seems like the key to "wire management is to keep the wire from moving and off the roof, secured to the racking, thus not compromising the insulation. _______________________________________________ List sponsored by Home Power magazine List Address: RE-wrenches@lists.re-wrenches.org Change email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org
_______________________________________________ List sponsored by Home Power magazine List Address: RE-wrenches@lists.re-wrenches.org Change email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org