Hello Wrenches,
On an upcoming project we are interconnecting (3) Power-One, ahem, ABB PVI 3.6 inverters to a 3Ph 277/480V service. Each inverter output is 16A at 277V, 1Ph. Is it code compliant to run the single phase output of each inverter to a single pole of a 3-pole [utility required] AC disconnect before landing at each 1-pole 20A breaker in the main panel? It would be great to avoid an inverter subpanel and 3-pole breaker in the MDP if possible. Thanks for your thoughts. Garrison Garrison Riegel Project Manager | <http://www.solarserviceinc.com/> Solar Service Inc [p] 847-677-0950 | <mailto:[email protected]> [email protected] NABCEP Certified PV Installation ProfessionalT
_______________________________________________ List sponsored by Home Power magazine List Address: [email protected] Change email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org