Wrenches, We’d like to land a ground mounted PV system at a meter pedestal to avoid trenching back to the house. Establishing the PV system as a parallel service, we could drive a ground rod at the pedestal and land GEC at PV disconnect.
This brings up the auxiliary grounding issue discussed by Mike Holt in his 2014 code video.https://www.youtube.com/watch?v=YuDqXFvRv94. Is there any way to properly ground this system without trenching back to house? Thank You, Kevin Pilcher Renovus Energy, Inc. PV Systems Designer NABCEP Certified 607.277.1777 office 607.882.0539 cell RENOVUSenergy.com
_______________________________________________ List sponsored by Redwood Alliance List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/[email protected]/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org