We’d like to land a ground mounted PV system at a meter pedestal to avoid 
trenching back to the house. Establishing the PV system as a parallel service, 
we could drive a ground rod at the pedestal and land GEC at PV disconnect.

This brings up the auxiliary grounding issue discussed by Mike Holt in his 2014 
code video.https://www.youtube.com/watch?v=YuDqXFvRv94.   

Is there any way to properly ground this system without trenching back to house?


Thank You,

Kevin Pilcher

Renovus Energy, Inc.
PV Systems Designer 
NABCEP Certified
607.277.1777 office
607.882.0539 cell
RENOVUSenergy.com


_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to