Hello water pumping Wrenches, I have a customer who has a Grundfos SQFlex 11 
pump and he is getting connected to the grid. He will still have his battery 
back up charged by PV and wants to look at the most efficient way to operate 
the pump. It seems to me that neither the IO101 or the CU200 really is needed 
and he could just wire directly to the inverter output at 240v via a pressure 
switch on a standard pressure tank for most efficient operation. Although this 
doesn’t give any access to the Grundfos built in diagnostics that display on 
the CU200. 

Would you recommend keeping a CU200 in the system or is it overkill? With the 
CU200 the max voltage is 120 whereas without it I can go with 240v and a more 
efficient operation… unless I am missing something.

Ron Young
_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to