I would rent a load bank, it will give you the versatility to change loads as needed.
On Tue, Mar 17, 2015 at 2:41 PM, Larry <[email protected]> wrote: > I am repairing and restoring a pair of poorly designed lithium-ion battery > bank that suffered over discharge, damaging many cells. After cell > replacement I need to perform a discharge test with a 10kW load to verify > the remaining capacity. The battery voltage is 105 volts @ 100% SoC and > 89.6 volts @ 0% > > I would like advice on how I can create an economical 10kW load. Water > heating element? Wire wound resistors? Are there any GT inverters that will > operate at these voltages? > > Thanks. > > -- > > > Larry Crutcher > Starlight Solar Power Systems > > _______________________________________________ > List sponsored by Redwood Alliance > > List Address: [email protected] > > Change listserver email address & settings: > http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org > > List-Archive: http://www.mail-archive.com/[email protected]. > org/maillist.html > > List rules & etiquette: > www.re-wrenches.org/etiquette.htm > > Check out or update participant bios: > www.members.re-wrenches.org > > -- Chris Mason NABCEP Certified Solar PV Installerâ„¢ Solar Design Engineer Generac Generators Industrial technician www.cometsolar.com <http://www.cometenergysystems.com> 264.235.5670 869.662.5670 Skype: netconcepts
_______________________________________________ List sponsored by Redwood Alliance List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/[email protected]/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org