I would rent a load bank, it will give you the versatility to change loads
as needed.

On Tue, Mar 17, 2015 at 2:41 PM, Larry <[email protected]> wrote:

> I am repairing and restoring a pair of poorly designed lithium-ion battery
> bank that suffered over discharge, damaging many cells. After cell
> replacement I need to perform a discharge test with a 10kW load to verify
> the remaining capacity. The battery voltage is 105 volts @ 100% SoC and
> 89.6 volts @ 0%
>
> I would like advice on how I can create an economical 10kW load. Water
> heating element? Wire wound resistors? Are there any GT inverters that will
> operate at these voltages?
>
> Thanks.
>
> --
>
>
> Larry Crutcher
> Starlight Solar Power Systems
>
> _______________________________________________
> List sponsored by Redwood Alliance
>
> List Address: [email protected]
>
> Change listserver email address & settings:
> http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
>
> List-Archive: http://www.mail-archive.com/[email protected].
> org/maillist.html
>
> List rules & etiquette:
> www.re-wrenches.org/etiquette.htm
>
> Check out or update participant bios:
> www.members.re-wrenches.org
>
>


-- 
Chris Mason
NABCEP Certified Solar PV Installerâ„¢
Solar Design Engineer
Generac Generators Industrial technician

www.cometsolar.com <http://www.cometenergysystems.com>
264.235.5670
869.662.5670
Skype: netconcepts
_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to