Installer went out of business, all I have to troubleshoot with is an as-built 3-line that "may or may not be right." The charge controllers are a pair Midnite Classic 200s. Customer complained that system selling only 2/3 of what was predicted back to the utility; that appears to be because everything out of his critical loads subpanel is running off the battery bank all night, every night, grid or no, so it takes 1/3 of the day to get the batteries charged up again every day and start selling to the grid.
I have very little experience with the XW+ thus my question for the folks here. My plan for next week is to show up, make my own as-built 3-line, and recommission the inverter. Anyone else seen this sort of thing before? Hard to believe that an electrician would mis-wire or not wire the bypass, I'm thinking software setting. Dan Fink Adjunct Professor of Solar Energy Technology, Ecotech Institute IREC Certified Instructor™ for: ~ PV Installation Professional ~ Small Wind Installer Executive Director, Buckville Energy NABCEP Registered Continuing Education Providers™ 970.672.4342
_______________________________________________ List sponsored by Redwood Alliance List Address: [email protected] Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/[email protected]/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org