A follow up on my most recent inspection. I was worried about the AHJ requiring the extra ground rod just below the array.

I didn't install the ground rod ahead of the the inspection and expected to argue against it, trying for Exception2.

I got signed off without having to install it.

Basically, the AHJ said that he was so overwhelmed by all the new requirements in 2014 that he was really not ready to enforce all of them, especially 690.47(D) which seemed to make no sense to him.

Well, that was way experience. I imagine that there must be some tension between the plan checker (who went out of his way to site and circle a call out to 690.47(D) on my plan set) and the inspectors who signed the permit card.

Mark


_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to