Hello again, wrenches.

 

I know many of us have run into the quandary and that is  prioritizing loads
in a critical load panel.

 

About to put in some LG RESU units with the SE7600 StorEdge and the 21 amps
continuous is pretty tough.

 

But with some smart, automated load management, this can work just fine.

 

Is there anything like the Generac SMM
(http://www.generac.com/all-products/transfer-switches/home-backup) out
there that does not depend on decreasing cycles/hz to recognize its bumping
into max load conditions?

 

Howard "Scot" Arey

254-300-1228

[email protected] <mailto:[email protected]> 

 



 

_______________________________________________
List sponsored by Redwood Alliance

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/[email protected]/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to